Energy · Wind farm developer, Saudi Arabia · 2024

Al Jouf yaw drives

180 yaw drive units, each a motor and a four-stage planetary gearbox, for 30 turbines in the Al Jouf region of northern Saudi Arabia.

Wind turbine nacelle being lifted by a crane

The result

yaw drive units
180
Six per turbine, 30 turbines
warranty claims
0
In the first eighteen months
lighter
12%
Than the drives they replaced
deliveries, all on time
5
Matched to the turbine build schedule

The challenge

Yaw drives turn the whole nacelle to face the wind, thousands of times a year, in sand-laden wind and temperatures from near freezing on winter nights to 48 °C in summer.

The developer needed 180 identical units delivered in batches to match the turbine build, and a lighter design to ease installation at hub height.

What we did

  1. Design

    A brake motor and four-stage planetary gearbox designed together, with a sealed output bearing.

  2. Qualification

    Two units run for 2,000 hours on a fatigue rig in Jebel Ali before production.

  3. Production

    Built in Jebel Ali in five batches, each tested and trucked to site.

  4. Support

    A spares stock at the wind farm and a ten-year service agreement.

On site

  • Wind turbine nacelle being lifted by a crane
    Wind farm developer, Saudi Arabia, 2024
  • Rows of finished yaw drive units on pallets in the factory
    Built in Jebel Ali in five batches, each tested and trucked to site.
180 yaw drives, five deliveries, every one on the agreed date and no warranty claims in eighteen months. That’s the whole review.
Noura Al ShammariProcurement lead, Saudi wind farm developer

Planning something similar?

Tell us the duty and the site. We’ll put you in touch with the engineers who did this job.

Chat on WhatsApp